Our Clients

1 2 3

Here are some of the jobs in line as well as executed:

Sl No. Title Period Description
17 CAT survey on TDPL pipelines M/s HPCL, Haldia Terminal Completed (2009) CAT using PMC for current mapping & depth measurement along the pipeline at an interval of 50 Mtrs, "A" frame
18 AMC of CP System MSV M/s HPCL, Indore Throughout 2008 – 10 Annual Monitoring & Maintenance contract for Mounded Storage Vessel (3 nos in single mound)
19 Pipeline CP System for M/s Indogulf Fertilizers Completed (January 09) High Silicon Fe Anoder Distributed type Anode Ground Bed
20 Pipeline CP for M/s Indogulf Fertilizers Completed Impressed Current Cathodic Protection System for Inside Plant Pipelines using TWO Deep Well Ground Bed.
21 Pipeline CP for M/s Avantika Gas Limited a joint venture of GAIL & HPCL Completed (April 08) Sacrificial Cathodic Protection for 10 inch dia gas pipeline for the design life of 20 years.
22 Pipeline CP for M/s Indogulf Fertilizers Completed (December 07) Impressed Current Cathodic Protection System for Inside Plant Pipelines using ONE Deep Well Ground Bed.